banner for SCI Zeithain workcamp
21/22.08
23.08
24.08
25.08
26.08
27.08
28.08
29.08
30.08
31.08
1.09
2.09
3.09
4.09
5.09
6.09
7.09
8.09
9.09
10.09
11.09
12.09

This is the video for Wednesday, the 25th of August.

If there is no video, you might need to download Flash Player.

Bärbel, our archaeological supervisor arrived today, and she explained in detail the results from last year. After lunch, we did our fist tentative steps in direction of actual work. Since the vegetation had grown quite a bit over the last year, our main task for today and the rest of the week was to cut down the grass etc and start the first excavations trying to locate the outer walls of the barracks and the intersection of the inner walls.

Video:

picture for the first video for the 25th of August

picture for the second video for the 25th of August

Pictures:

the group having lunch

Carine, Tara and Marlen

picture of Bärbel and Carine

Me, me, me

Malin and Fabio

Carine, sleeping

impression of us in the high grass

pastel of us in high grass

everyone resting

sleep, oh sweet sleep

 

Valid XHTML 1.0! Valid CSS!