21/22.08 23.08 24.08 25.08 26.08 27.08 28.08 29.08 30.08 31.08 1.09 2.09 3.09 4.09 5.09 6.09 7.09 8.09 9.09 10.09 11.09 12.09 |
Fabio, Tara and Carine continue working on an excavation started in the camp last year to see how the "T" section of the barracks outer wall with an inner intersecting wall continues. |
Video: Pictures: |