banner for SCI Zeithain workcamp
21/22.08
23.08
24.08
25.08
26.08
27.08
28.08
29.08
30.08
31.08
1.09
2.09
3.09
4.09
5.09
6.09
7.09
8.09
9.09
10.09
11.09
12.09

documenting our results of the digging

It's Friday and before the weekend we documented the resulkts of our work- as seen here first by taking a picture from as vertical a position as possible standing on a small ladder before B'rbel would later make drawings true to scale. In order to soften the shadow in the picture we tried to block out the sun as much as possible.

Video:

video for the 27th August

Pictures:

documenting the excavation

Valid XHTML 1.0! Valid CSS!

Click here to return to Rolf Schwarz SCI camps pages